• Contact
  • Service
  • Components
    • Components for elevators
    • Process monitoring systems
    • Abrasion polyurethane liners
    • Components for horizontal conveying
    • Parts for sifters and screens
  • Downloads
  • About us

Call us +31 88 3695444

Location
info@mullerbeltex.com
Language
  • lang English
  • lang Nederlands
Muller BeltexMuller Beltex
  • Components
    • Elevators
      • Elevator belts
      • Elevator buckets
      • Elevator bolts
      • Elevator belt fasteners
      • Drive and return pulleys
      • Pulley lagging
    • Abrasion polyurethane liners
      • Kryptane Yellow
      • Kryptane Red
      • Kryptane Green
      • Kryptane Black
      • Blue-Ox Blue
      • FRAS antistatic
      • Kryptile Ceramics
      • Kryptane KS03 duo
      • Fixing Materials
    • Process monitoring
      • Belt misalignment monitoring
      • Bearing temperature monitoring
      • Speed monitoring
      • Radar & level instruments
      • Data acquisition & SCADA-systemen
      • Controllers, indicators & transmitters
      • Explosion vent panels & flameless vents
    • Parts for sifters and screens
      • Sieve balls
      • Plansifters
      • Bushings
    • Horizontal Conveying
      • Conveyor belts
      • Air permeable fabric
      • Accessories
  • Service
  • Downloads
  • About
    • Muller Beltex
    • News
    • Cases
  • Contact

Archive

Monthly Archive for December, 2015

Home Blog2015 December
“METALLAG” bucket elevator pulley lagging for high heat applications

“METALLAG” bucket elevator pulley lagging for high heat applications

In belt/bucket elevators the design and condition of the pulleys is of crucial importance to the life of the belt. In elevators handling very hot material the belts are heat resistant, e.g. type Polysur T150.

However, the rubbers used as friction layer on the drive pulleys, the lagging, are only available in low heat resistant qualities. The result is that in many elevators handling hot material, such as occurs in elevators handling hot minerals, cement and fly ash, the pulley lagging needs to be replaced frequently during the lifetime of a belt. Once a lagging is affected by the high temperature reigning in the elevator, it crumbles and is lost and when that happens the belt rides over an uneven surface leading to tracking problems and wear to the belt.

Muller Beltex has designed and supplied “METALLAG” all metal bolted on pulley laggings, with a tracking crown for high heat applications. The current practical results show that in severe cases handling product of +165°C. where laggings and pulleys were replaced every 6 months, the investment was earned back after 1.5 year, during which replacement of pulleys and laggings was avoided. The condition of the belts after this period of time have clearly improved, compared to the previous situation.

The life expectancy of the “METALLAG” all metal lagging is 3-5 years. The material is very abrasion-resistant and offers a very positive grip on the belt avoiding belt slip.

Would you like to have more information? Please contact one of our specialists on the telephone number mentioned below.

Advice about problem elevators

Advice about problem elevators

Muller Beltex has many years of experience and global expertise in the bulk and process industry. That is why we, as a renowned knowledge and service provider, are often approached by equipment manufacturers and end users who are encountering problems with their equipment.

Their questions may involve durability, the wish to reduce excessive wear or capacity issues. In this article, we will enter into a specific problem we often come across in more older elevators used in the agricultural sector, which is product taken down again in the return part of a bucket elevator, so called “back-legging”. What does this mean?

Product that is not correctly or not discharged from the elevator bucket and is therefore dropped back into the down-going elevator leg. This may be because the elevators were designed for example in the nineteen eighties for a capacity of 70 tons per hour at a certain belt speed and the elevator was fed in the up-going elevator leg. At the time, only one type of product was transported with the elevator in question. However, over the following decades, the tonnage may have been increased to perhaps 100 tons per hour, transporting multiple products with a variety of densities at the same belt speed.

In addition the feeding of the elevator could be both in the up-going and also in the down-going leg of the elevator. Because the product is ending up in the elevator boot section, the buckets need to dig up the product from the boot of the elevator, which leads to unnecessary wear and additional stress on the bucket elevator components and the required capacities are no longer realised.

Extensive inspection of the installation allows us to study the problems. We analyse the existing situation and draw up a plan of approach in consultation with our engineering department. This plan of approach is presented to our customer, together with a specified quotation.

Expert calculation of the correct drive and return pulley, elevator bucket, bucket formation, belt speed, and if applicable, adjustment of the construction itself allows us to successfully solve complex problems like the one described above.

Do you have a question or problem for which you would like our support? Please do not hesitate to contact us. Our telephone number is listed below.

>Return to news overview

news

  • Solid partners join forces and consolidate expertise and know-how
  • Kryptane® Urethane magnetic wear liners
  • Elevator bucket venting, when & why
  • Replacing steel cord elevator belts by means of a multiple use belt fastener
  • Kryptane® magnetische polyurethaan panelen

Contact

Are you interested? Or would you like to receive more information about the subject you've read about? Than type your message below. We will reply as quickly as possible.

Send

‘ELEVATOR’ PITCH

SOLID PARTNERS FOR POWDER & BULK HANDLING COMPONENTS

Our stockholding range of components for the agricultural and industrial bulk- and process industry and extensive knowledge combined, allows us to always offer an economic and fast solution with a maximum service life for your specific issue.​


VCA_logo_245px-breed_diapositief

Newsletter

Subscribe to our newsletter and stay informed about the latest developments.

    Your Name

    Email

    MULLER BELTEX OFFICE

    • Tochtweg 1
    • 2642 AP Pijnacker - The Netherlands
    • +31 88 369 54 44
    • info@mullerbeltex.com

    PRODUCTION AND LOGISTICS
    Meenlandweg 2
    2642 AN Pijnacker – The Netherlands​

    Our disclaimer & general terms

    ©2025 — Concept & realisatie door Brandindustry

    Show
    Share on facebook
    Share on twitter
    Share on linkdin
    Share on instagram